Lambert References

Available for Download

H. Lambert, System Safety Analysis and Fault Tree Analysis, UCID 16238 May 1973

H. Lambert “Fault Trees for Decision Making in Systems Analysis,” Ph.D. thesis, Lawrence Livermore National Laboratory, Rept. UCRL-51829, 1975.

H. Lambert, B. Davis, The Fault Tree Computer Codes IMPORTANCE and GATE, FTA Associates July 1980

H. Lambert, G. Yadigaroglu, Fault Trees for Diagnosis of System Fault Conditions, Nuclear Science and Engineering, 62, 20-34 (1977 )A

H. Lambert, Comments on the Lapp Powers Computer-Aided Synthesis of Fault Trees , IEEE Transactions on Reliability, Vol R-28, No.1 April 1976

H. Lambert, J. Lim, F. Gilman, A Digraph-Fault Tree Methodology for the Assessment of Material Control Systems, Lawrence Livermore National Laboratory, NUREG/CR-0777 UCRL-5271

H. Lambert, Overview of the Use of FTAP and IMPORTANCE, FTA Associates

H. Lambert, Digraph Fault Tree Methodology (and its use in Transportation Risk Analysis, FTA Associates, May 1981

H. Lambert, B. Calloway “Precipitate Hydrolysis Fault Tree Analysis, Removal of PVVH LEL Analyzers,” Westinghouse Savannah River Company, December 10, 1993

H. E. Lambert, Fault Tree Analysis for Ammonium Nitrate (AN) Explosion Within the Chemical Process Cell, FTA Associates, Rev. 1, June 1994.

H. E. Lambert, Fault Tree Analysis for Fire and Explosion Within the Salt Process Cell (Late Wash), for Westinghouse Savannah River Company, FTA Associates, February 1993.

H. E. Lambert, Precipitate Pump Tank Fault Tree Analysis, Prepared for the Westinghouse Savannah River Company, FTA Associates, June 26, 1992

H. E. Lambert, Measures of Importance of Events and Cut Sets in Fault Trees in Reliability and Fault Tree Analysis, R. E. Barlow, et al., ed., SIAM, 19 UCRL-75853

J. Fussell, H. Lambert, Quantitative Evaluation of Nuclear System Reliability and Safety Characteristics, Vol R-25, No.3 April 1976

H. Lambert, J. Matore, S. Hobbs Determining Safety Importance at Systems and Components at Nuclear Power Plants, IAEA report no TECDOC-590, April 1991

H. K. Hasegawa and H. E. Lambert, Reliability Study on the Lawrence Livermore Laboratory Water Supply System, LLNL, Rept. UCRL-92057, February 1985.

G. Naanep, H. Lambert, H Hasegawa, Fire Protection Study of the 2XIIB Mirror Fusion Facility, Lawrence Livermore National Laboratory, UCRL-82277 August 21, 1979

H. Lambert, N. Alvares, Pepcon Disaster — Causative Factors and Preventive and Mitigative Features UCRL-JC-154704 July 2003

H. Lambert and J. Matore, Heavy Loads Safety Assessment, National Science Foundation, Oct 1988

C. Dunglinson and H. Lambert, Interval Reliability for Initiating and Enabling Events, IEEE Transactions on Reliability Vol R-32, No.2 June 1983

H. Lambert, Use of Fault Tree Analysis for Automotive Reliability and Safety Analysis, UCRL-JC-154905 2003

N. Alvares, H. Lambert, Realistic Probability Estimates for Destructive Overpressure Events in Heated Center Wing Tanks Of Commercial Jet Aircraft, UCRL-CONF-228030, April 2007

R. Budnitz, H. Lambert and E. Hill, Relay Chatter and Operator Response After a large Earthquake, NUREG CR 4910 August 1987

H.Lambert, Circuit Breaker Operation and Potential Failure Modes during an Earthquake A Preliminary Investigation, LLNL, UCID-20086, April 1984

H. Lambert, L. Philipson, J. Fragola, NASA Risk Management Program Tools and Techniques Handbook, NASA final draft report, July 1993.

H. Lambert and G. Johnson, “Supplemental Analysis to Support Postulated Events in Process Hazards Analysis for the High Explosive Applications Facility (HEAF),” Lawrence Livermore National Laboratory, UCRL-ID-150819, July

H. Lambert and G. Johnson , “Identification of Process Hazards and Accident Scenarios for Site 300, Lawrence Livermore National Laboratory,” UCRL-ID-150822, May 4, 2001

H. Lambert, Wet Handling Facility Event Sequence Development Analysis, 050-PSA-WH00-00100-000-00A, Yucca Mountain Project, February 2008.

R. Budnitz, et al, Shoreham PRA Review, Volume I Main Report, Future Resources Associates September 1982

R. Budnitz, et al, Shoreham PRA Review, Volume II Appendices Future Resources Associates September 1982

R. Budnitz, H. Lambert 1990, Evaluation Reliability and Usefulness of External- Initiators PRA Methodologies, NUREG-CR-5477 January 1990

R. Budnitz, H. Lambert – PSA Peer Review – Case Study IAEA-TECDOC-522 October 1989

C.F. Guenther, H.A. Elayat, W.J. O’Connell, H. Lambert, Modeling Efforts to Aid in the Prediction of Process Enrichment Levels with the Intent of Identifying Potential Material Diversion

H. Lambert, H.A. Elayat, W.J. O’Connell, L. Szytel, M. Dreicer, LISSAT Analysis of a Generic Centrifuge Enrichment Plant, UCRL-CONF-231881, June 18, 2007.

S. C. Lu, et al, Consequence Evaluation of Radiation Embrittlement of Trojan Reactor Pressure Vessel Support, Lawrence Livermore National Laboratory, NUREGCR-5644 UCRL-ID

S. C. Lu, G.S. Holman, H.E. Lambert, Consequence Evaluation of Hypothetical Reactor Pressure Vessel Support Failure, UCRL-JC-104581, January 1991

Budnitz,et al, A Methodology for Analyzing Precursors to Earthquake-Initiated and Fire-Initiated Accident Sequences NUREG CR-6544 April 1998

H. E. Lambert and J. J. Lim, Modeling of Adversary Action for Safeguards Effectiveness Assessment, INMM Conference, 1977, Arlington, VA

H. Lambert, F. Gilman, and J. Lim, Material Control Study, A Directed Graph and Fault Tree Procedure for Adversary Event Set Generation, UCRL 81823 October 1978